This video is a on how to create, copy from, comments, crews, systems, phases, labor activity, work type, employees, add line, lost hours, deleting, equipment, issues, populate timecards, edit, attach, email, and view. See Daily Report Setup video.
Copy From
The Copy From function allows you to copy from any daily report you have already entered.
Custom Number
If left blank, your system will number your daily reports for you. It is never recommended you enter a custom number within eSUB.
Date
Today’s date will populate, which may be changed before saving.
Time On Site, Time Off Site
The time your company has spent on a jobsite can be documented here. To default these, navigate to, Project > Setup > Project Preferences > DRs tab > update information > Save Data.
Total Workers
This field will complete for you once you save the daily report, based on how many Employees you have.
Report From
Select who is submitting the daily report. Names in the drop down are populate from the Contact Log of Employees. To add a contact, navigate to, Contacts > Add Contact.
Weather, Wind, Temperature
Information will update for you based on the city and state, or zip code entered. To update, navigate to, Project > Edit > update information > Save Data.
Comments (8 different fields)
Log notes and occurrences of the day. Using different sections will create different sections on your daily report. Checking the Internal box will mark the comments as internal only comments. Viewing, printing, and emailing will give you an option to print with or without internal comments.
My Crew
Add a different crew when you enter employees for different System and Phase (if applicable), Labor Activity, and Base Contract. Crew may be deleted by selecting the white "X" in the right corner of the crew box.
System and Phase
If you use system and phase on a project, select which this employee(s) will be charged to. System and phases can be setup by navigating to, Project > Setup > Configure Project > Add System and Add Phase.
Labor Activity
Select activity the employee(s) worked on. See Add Labor Activity.
Work Type
Select what contract amount will charge against.
Employees
Select employees that worked on this particular crew. See Adding Employees for Timecards video. Employees may be deleted by selecting the red "X" in the right corner of the employee line.
1x, 1.5x, 2x, Lost
Regular time, time and a half, double time, and hours lost on a project. If hours are lost, the comments field for this line item is mandatory.
Comments
Comments for this employee line. If there are hours Lost, this field becomes mandatory.
Subcontractors
Select a subcontractor contact and add the number of workers that were on site that day.
Equipment
Select equipment used this day, including hours and notes. See Add Equipment.
Materials
Select materials used this day, including quantity, and notes. See Add Material.
Issues Link
Select an issue to link a topic to this and other documents. To enter an issue, navigate to, Enter >Issues.
New Daily Report
New
- Complete fields as outlined above. Required fields are red.
- Save Data
Edit Daily Report
DR Log
Edit (pencil icon) next to daily report.
- Update daily report information.
- Save Data.
Comments
0 comments
Please sign in to leave a comment.